Site surveys & detailed engineering design for Bhaupur - Khurja section of dedicated freight corridor


Uttar Pradesh, India
Metros & railways

Project Description


The work on the eastern section of the Dedicated Freight Corridor (DFC) between Khurja and Bhaupur comprises of an electrified double track railway section, capable of operating at a maximum train speed of 100 km/hr. All the bridges, culverts and the entire embankment and cutting are constructed for ‘DFC Loading’ (32.5 t axle load).

Assystem Stup’s scope of services included site reconnaissance and review of available data, topographical survey, geotechnical investigations, hydrological investigations & other field investigations related to the design engineering inputs ; preliminary and detailed engineering design of the alignment, track, earthwork profile, switches and crossings, station buildings and associated amenities, yards, major and minor bridges, culverts, rail flyovers & rail under bridges, foot-over bridges, level crossings at appropriate locations, value engineering for the entire design components, all enabling works and responding to project execution requirements.

Our main services in Metros & railways


Discover all our offers

Project management (PMO, construction supervision, testing, commissioning …)

Systems engineering, PLM, Digital Twin, management of regulatory requirements

Automation, instrumentation and control systems integration

Support in safety and security standards and requirements (Hydrogen, ATEX, SEVESO, Nuclear…)

 

A project? A question?

Our teams are at your disposal for any questions or additional information.

Contact us